— Project Overview
Provided removal of existing 16m bridge and installation of new 26m composite bridge. The new substructure consisted of pour-in-place footing and wingwalls atop a rock bluff on the low chain end with post-and-pad on the high chain end. Road works were required to complete needed road repairs.