Provided removal of existing 16m bridge and installation of new 26m composite bridge. The new substructure consisted of pour-in-place footing and wingwalls atop a rock bluff on the low chain end with post-and-pad on the high chain end. Road works were required to complete needed road repairs.

Client
Ministry of Forest, Lands, and Natural Resources, Cranbrook, BC
Value
Approx. $105,000
Location
North East of Cranbrook, BC
Timeline
Spring 2018