— Portable Bridge Solutions
Bridge solutions built to keep Alaska projects moving
From engineering and fabrication to mobilization and installation, GNB has the bridges, equipment, expertise and experienced crews to take demanding access projects from concept to completion.
Built for the North. Ready to execute in Alaska.
Oil & Gas | Energy | Mining | Infrastructure
Portable Bridge Rental|Engineering|Fabrication|Transportation|Mobilization|Installation|Relocation|Removal
Keep your project moving
When conventional infrastructure is not practical, GNB provides portable bridge solutions designed for rapid mobilization, remote access and dependable execution.
Northern experience. Alaska-ready execution. GNB gets it done.
— Why GNB
The equipment, experience and crews to execute
Western Canada + Arctic Experience
Deep regional bridge resources support responsive Alaska mobilization and execution.
Remote Access|Extreme Weather|Difficult Crossings|Challenging Logistics
Capability
GNB has the bridge inventory, equipment, engineering expertise and experienced crews to tackle remote and complex access projects others may not be equipped to handle.
Speed
Rapid mobilization and portable bridge systems help protect schedules, reduce access delays and support cost and schedule certainty when conventional infrastructure is not practical.
Reliability
Experienced crews, engineered solutions, dependable equipment and quality-controlled fabrication support consistent execution from planning through installation and removal.
Northern Experience
More than 30 years in demanding northern environments has prepared GNB for extreme weather, remote logistics, rivers, resource roads and limited infrastructure.
— Alaska Deployment
Fairbanks, Alaska
A staging hub is being established to support responsive bridge deployment for Alaska projects.
Regional Fleet + Operational Support
Canadian yards support Alaska execution
— Project Proof
Proven at scale: Coastal GasLink Pipeline
GNB supplied portable bridges across four construction spreads on the 416-mile Coastal GasLink Pipeline in British Columbia. The work demonstrated fleet depth, rapid mobilization, bridge relocation and dependable multi-spread field support across challenging northern terrain.
Project length: TC Energy, 670 km / 416 mi.
Safety-Focused Execution
Engineered Bridge Solutions|Experienced Construction Crews|Quality-Controlled Fabrication|Reliable Equipment|Proven Installation Practices

When access can’t wait, call GNB.
Let’s build access across Alaska.
