Portable Bridge Solutions

Bridge solutions built to keep Alaska projects moving

From engineering and fabrication to mobilization and installation, GNB has the bridges, equipment, expertise and experienced crews to take demanding access projects from concept to completion.

Built for the North. Ready to execute in Alaska.

Oil & Gas | Energy | Mining | Infrastructure

GNB Northern Field Operations
175+
Portable Bridges
Available
30–120 ft
Engineered
Clear spans
200,000 lb
L-100 Load Capacity
90.7 metric tons
30+
Years of Northern
Project experience

Portable Bridge Rental|Engineering|Fabrication|Transportation|Mobilization|Installation|Relocation|Removal

Keep your project moving

When conventional infrastructure is not practical, GNB provides portable bridge solutions designed for rapid mobilization, remote access and dependable execution.

Northern experience. Alaska-ready execution. GNB gets it done.

Why GNB

The equipment, experience and crews to execute

175+
Portable Bridges
One of Canada’s largest portable bridge fleets

Western Canada + Arctic Experience

Deep regional bridge resources support responsive Alaska mobilization and execution.

Remote Access|Extreme Weather|Difficult Crossings|Challenging Logistics

01

Capability

GNB has the bridge inventory, equipment, engineering expertise and experienced crews to tackle remote and complex access projects others may not be equipped to handle.

02

Speed

Rapid mobilization and portable bridge systems help protect schedules, reduce access delays and support cost and schedule certainty when conventional infrastructure is not practical.

03

Reliability

Experienced crews, engineered solutions, dependable equipment and quality-controlled fabrication support consistent execution from planning through installation and removal.

04

Northern Experience

More than 30 years in demanding northern environments has prepared GNB for extreme weather, remote logistics, rivers, resource roads and limited infrastructure.

Alaska Deployment

Fairbanks, Alaska

Staging hub being established

A staging hub is being established to support responsive bridge deployment for Alaska projects.

Regional Fleet + Operational Support

Fairbanks, AK
Fort St. John, BC
Houston, BC
Nisku, AB

Canadian yards support Alaska execution

Project Proof

Proven at scale: Coastal GasLink Pipeline

GNB Northern Bridge Deployment
4
Construction spreads
416 miles
Coastal GasLink project

GNB supplied portable bridges across four construction spreads on the 416-mile Coastal GasLink Pipeline in British Columbia. The work demonstrated fleet depth, rapid mobilization, bridge relocation and dependable multi-spread field support across challenging northern terrain.

Project length: TC Energy, 670 km / 416 mi.

Safety-Focused Execution

Engineered Bridge Solutions|Experienced Construction Crews|Quality-Controlled Fabrication|Reliable Equipment|Proven Installation Practices

When access can’t wait, call GNB.

Let’s build access across Alaska.